Where this is going
Five slides. Re-issued every quarter, because the pace of change makes anything longer a lie.
How to read this. Titles last; boxes expire.
The titles are the durable part
Each slide’s title is a way of thinking about its question, built to survive several issues. If a title changes between issues, the series changed its mind, and the notes say why.
The boxes are this quarter’s facts
Every number sits in a box with the date it was checked, and a source in the notes that was actually opened. Treat them as a photograph, not a forecast. Re-check before you quote.
The last slide is the schedule
Which slides in the main series carry a check date and should be re-read with each issue, and when the next issue is due. Thirty minutes a quarter, not a project.
What the labs say
Their own dates, quoted and hedged.
What is measured
Neutral trackers: the rate and the error bars.
The money
Capex, revenue, and the bubble question.
Next twelve months
One expectation per Part, II to XII.
What will not change
Six questions and the re-check cadence.
Issue · November 2026. Next issue: February 2027. Previous issues: none; this is the first.
Expectation, not prediction: where the evidence points, stated so you can plan against it and be wrong cheaply.
A page of instructions, because an appendix that is thrown away every quarter needs a different reading habit from the numbered parts. The slide titles are the durable layer: each is a way of thinking about the question, and it should survive several issues. The boxes are the perishable layer: every number carries the date it was checked and a source in the notes that was opened, not skimmed. Treat them as a photograph of October 2026. The word used throughout is expectation, not prediction: an expectation is where the evidence points, stated plainly enough that you can plan against it and discover cheaply when it is wrong. A prediction is a bet, and this series does not make them. The five content slides follow in order: what the people building the thing say, what the neutral trackers measure, what the money looks like, one expectation per numbered Part for the next twelve months, and the six questions that have not changed since Part I, with the maintenance schedule for the rest of the series.
What the labs say. Dated, quoted, and they are selling it.
“Powerful AI” in one to two years. Maybe.
Essay, Jan 2026: powerful AI “could be as little as 1–2 years away, although it could also be considerably further out”; a “country of geniuses in a datacenter” in “~2027”. Podcast, Feb 2026: 90% within ten years; “I wouldn’t be surprised if I’m off by a year or two.”
AGI “by year end”. On its own definition.
TIME profile, 26 Aug 2026: by the end of 2026 OpenAI will have an internal system it calls AGI, built on its Astra models. OpenAI’s charter defines AGI as systems that “outperform humans at most economically valuable work”. No outside test of that exists.
AGI in “two to three years”.
Wall Street Journal, Oct 2026: “It’s going to happen soon. My estimate keeps moving closer to the present.” At Davos in January he had said five to ten years. His bar: the “full cognitive range of the human brain”.
Statements as published to 28 Oct 2026. Dissenter: Yann LeCun, Davos, Jan 2026. Re-check before you quote; these people are asked weekly. Next issue: February 2027.
Treat every date here as a planning assumption, not a prediction. Three people selling the thing say it is close; a serious dissenter says text-trained models will never get there. Plan so that either is survivable.
Start with what the people building the thing say, because everyone in the room has read a headline about it and the headlines strip the hedges. Dario Amodei’s January 2026 essay says powerful AI “could be as little as 1–2 years away, although it could also be considerably further out”, and asks the reader to suppose a “country of geniuses in a datacenter” materialises somewhere “in ~2027”. On the Dwarkesh podcast in February he put the chance of that within ten years at 90 percent, said his hunch for the near case was “one to two, maybe more like one to three” years, and added that he “wouldn’t be surprised” to be off by a year or two. Sam Altman, in a TIME profile published 26 August 2026, said OpenAI would have an internal system it calls AGI by the end of the year, built on the Astra model family; the company’s charter defines AGI as “highly autonomous systems that outperform humans at most economically valuable work”, and there is no agreed external test for that. Demis Hassabis told the Wall Street Journal in October that his estimate “keeps moving closer to the present”, now two to three years; at Davos in January he had said five to ten, and that one or two more breakthroughs might be needed. Three things to notice. Each man’s company is valued on these claims. That does not make them wrong, but it is a reason to read the hedges, which are real and which headlines remove. The definitions differ: Hassabis means the full cognitive range of a human brain, OpenAI means economic output, Amodei describes a cluster of geniuses rather than one mind. And there are serious dissenters; Yann LeCun said at the same Davos that “we’re never going to get to human-level intelligence by training LLMs or by training on text only”. The durable rule is on the slide. Do not predict. Take the labs’ dates as a planning assumption, test your plans against the world where they are right and the world where they are five years early, and make sure neither bankrupts you.
Sources (5)
- https://darioamodei.com/essay/the-adolescence-of-technology
- https://www.dwarkesh.com/p/dario-amodei-2
- https://www.forbes.com/sites/anishasircar/2026/08/28/openai-says-agi-is-coming-by-year-end-it-also-just-had-the-worst-safety-crisis-in-its-history/
- https://the-decoder.com/deepmind-founder-hassabis-shortens-agi-timeline-from-five-to-two-to-three-years/
- https://www.fortune.com/2026/01/23/deepmind-demis-hassabis-anthropic-dario-amodei-yann-lecun-ai-davos
What the measurements say. Three trends, three caveats.
~4 months
Doubling time of the longest software task (in human hours) the best model finishes half the time: 131 days for models since 2023, per METR’s Jan 2026 re-fit; about 7 months over 2019–2025. Highest reading: Claude Opus 4.6, ~14.5 hours (Feb 2026). METR says its suite is now saturated above 16 hours.
5× a year
Growth in the computing power used to train each year’s frontier language models since 2020, per Epoch AI; the cost of a frontier training run grows about 3.5× a year. Meanwhile the price of a fixed level of capability falls every year (Part IX). Both are true: the frontier moves, and last year’s frontier gets cheap.
<1% → 63%
ARC-AGI-3, a puzzle benchmark built to resist memorisation, launched in March 2026 with every frontier model under 1%. By September GPT-6 Astra scored 62.7% on the organisers’ standard harness (OpenAI’s own harness: 99.9%). Six months from new test to nearly done; about $26,000 of compute a run.
METR Time Horizon 1.1 (29 Jan 2026), page marked no longer updated (8 Sep 2026); Epoch AI trends (5 Feb 2026); ARC Prize via TNW, The New Stack (Sep 2026). Checked 28 October 2026. These change: re-check before you quote them. Next issue: February 2027.
The direction is not in doubt. The rate has wide error bars, and none of it is measured on your work.
Now the people with no product to sell. METR, a non-profit evaluator, measures the longest software task, in hours of human work, that the best model can finish half the time. Its March 2025 paper found that figure doubling about every seven months since 2019; its January 2026 re-fit, Time Horizon 1.1, found 131 days (confidence interval 107 to 161) for models since 2023 and 89 days for models since 2024. The highest reading it has published is Claude Opus 4.6 at around 14.5 hours in February 2026, with a 95 percent interval of 6 to 98 hours, which METR itself called “extremely noisy because our current task suite is nearly saturated”. By May it had added a warning that measurements above 16 hours are unreliable, and in September it marked the page as no longer actively updated. The caveats are METR’s own: error bars of roughly a factor of two, a suite that is almost entirely software and research engineering, horizons forty to a hundred times shorter on tasks that mean driving a screen, and an 80-percent-reliable horizon that trails far behind the headline. Epoch AI tracks the inputs. Its dashboard, refreshed 5 February 2026, has training compute for frontier language models growing five times a year since 2020 and the cost of a frontier run growing about three and a half times a year; the same group documented in Part IX that the price of buying a fixed level of capability falls by an order of magnitude or more each year. Both are true at once because the frontier keeps moving while last year’s frontier gets cheap. The third measurement is about measurement itself. ARC-AGI-3 launched in March 2026 with every frontier model under one percent; by September GPT-6 Astra scored 62.7 percent on the organisers’ standard harness, and 99.9 percent on OpenAI’s own adapter, which keeps reasoning state between steps. Same weights, different scaffolding, different score, and ARC Prize’s co-founder wrote that “we lack evidence to call this AGI yet”. Benchmarks now live months. A beaten benchmark proves the test is beatable, which is why the only evaluation that matters is yours.
Sources (8)
- https://metr.org/blog/2026-01-29-time-horizon-1-1/
- https://metr.org/time-horizons/
- https://x.com/METR_Evals/status/2024923422867030027
- https://agitracker.io/blog/metr-time-horizons-2026/
- https://epoch.ai/trends
- https://epoch.ai/publications/training-compute-of-frontier-ai-models-grows-by-4-5x-per-year
- https://thenextweb.com/news/openai-astra-arc-agi-3-harness-62-7-vs-99-9-benchmark-revisions
- https://thenewstack.io/astra-arc-agi-benchmark/
The money. Spending is ahead of revenue; revenue is real. Both.
~$735B
2026 capital spending guided by Amazon (~$220B), Alphabet ($195–205B), Microsoft (~$175B) and Meta ($135–145B), mostly AI data centres. About $410B in 2025. Three of the four report again this week; expect it to move.
~$50B · $16.3B
OpenAI’s annualised revenue as told to investors in October (FT), after a $70B figure was walked back. Anthropic’s S-1 (26 Oct): $16.3B revenue in H1 2026, from $1.16B a year earlier; $974M operating profit in Q2. Different revenue definitions: do not compare.
+52% vs +23%
Token volume bought by Ramp’s business customers rose 52% in the four weeks to 11 Oct 2026. Spend rose 23%. The blended price fell a quarter, to $0.64 per million tokens. Usage explodes; price per unit collapses faster. Good for buyers; awkward for anyone who borrowed to build capacity.
Says bubble
- Gartner, 14 Oct: data centres need $8.5T of revenue by 2030 to pay back; it sees at most $3.6T. Over $3.5T of spend exposed to write-downs.
- Circular money: clouds invest in labs, labs commit hundreds of billions back to clouds.
- One revenue footnote (8 Oct) hit Nvidia, Oracle and CoreWeave in a day.
Says not, or not yet
- Demand is measured, not promised: Anthropic went from $1.16B to $16.3B in a half-year, with an operating profit in Q2.
- The big four fund it from cash flow; Gartner says they are the least exposed. The neoclouds are another matter.
- The gap can close from either side: revenue up, or capex cut.
What it means for a buyer
- Prices for a fixed capability keep falling (Part IX). Negotiate yearly; never sign for three.
- Not every vendor survives a correction. Pin versions; keep an open-weight fallback that passes your eval.
- Keep the abstraction layer from Part IX. It is insurance whichever side is right.
Guidance via valueaddvc (22 Oct); FT via TechCrunch, 8 Oct; Anthropic S-1 via TNW, 26 Oct; Ramp AI Index, Oct; Gartner, 14 Oct. Checked 28 October 2026. These change: re-check before you quote them. Next issue: February 2027.
Spending leads revenue; revenue is real; nobody knows which gives first. Build so you are fine either way.
The money question gets asked at every forum, so here it is handled like an adult: three numbers, both arguments, and what it means for someone buying rather than investing. The spending first. As guided after their most recent results, Amazon plans about 220 billion dollars of 2026 capital expenditure, Alphabet 195 to 205 billion, Microsoft about 175 billion for the calendar year (lower than an earlier 190 because of a lease-accounting change, not a cut), and Meta 135 to 145 billion, raised on 21 October. Call it 735 billion for four companies, against about 410 billion in 2025. Microsoft, Alphabet and Amazon report again in the last days of October, so this figure will move within days of this issue. The revenue next. OpenAI told investors in October that its annualised revenue was approaching 50 billion dollars, the Financial Times reported; a 70 billion figure that circulated in September turned out to be investors’ attempt at an apples-to-apples comparison with Anthropic, which counts sales through cloud partners and OpenAI does not. Anthropic’s S-1, public on 26 October, shows 16.3 billion of revenue in the first half of 2026 against 1.16 billion a year earlier, an operating profit of 974 million in the second quarter, and a headline net loss of 80.7 billion that is almost entirely a non-cash revaluation of convertible notes. The third number is the one buyers should enjoy: Ramp’s index of its business customers shows token volume up 52 percent in the four weeks to 11 October while spend rose 23 percent and the blended price fell to 64 cents per million tokens. The bubble case is Gartner’s arithmetic, published 14 October: data-centre owners need about 8.5 trillion dollars of cumulative revenue by 2030 to cover announced spending, financing and a 12 percent return, against at most 3.6 trillion of AI revenue it can see, leaving more than 3.5 trillion of spend exposed to impairment. Add the circularity of clouds investing in labs that commit hundreds of billions back to clouds, and a market that fell on a single revenue footnote on 8 October. The case against is that demand is measured rather than promised, that the four big spenders fund it from cash flow and are, in Gartner’s own view, the least exposed, and that the gap can close from either side. For a buyer the answer does not depend on who is right: negotiate short, pin versions, keep a fallback that passes your eval, and keep the layer from Part IX.
Sources (8)
- https://valueaddvc.com/ai-spending
- https://techcrunch.com/2026/10/08/openais-revenue-is-reportedly-20-billion-less-than-previously-projected/
- https://thenextweb.com/news/anthropic-ipo-filing-nasdaq-ant-s-1
- https://ramp.com/data/ai-index
- https://ramp.com/data/ai-index-sept-2026
- https://www.gartner.com/en/newsroom/press-releases/2026-10-14-gartner-says-over-us-dollars-three-and-a-half-trillion-of-artificial-intelligence-infrastructure-spending-could-be-exposed-to-impairment-by-the-end-of-2030
- https://fortune.com/2026/10/21/ai-boom-5-trillion-paying-itself-data-centers/
- https://fortune.com/2026/10/17/ai-boom-vs-bust-bubble-warning-hyperscaler-spending-debt-coreweave-nvidia/
By next autumn, by Part. Expectations, not predictions.
| Part | Topic | The thing most likely to have changed by November 2027 |
|---|---|---|
| II | Local AI | A 30B-class open model that matches 2025’s frontier on your eval, on a laptop you already own (Meta’s 30B Muse Glimmer is Apache 2.0). More jobs pass the local test; licences keep changing. |
| III | Agentic AI | An agent feature inside every SaaS tool you pay for, usually unasked. Gartner still expects over 40% of agentic projects cancelled by end-2027. Run the sniff test on each one. |
| IV | How it works | Longer context, more “thinking” billed as output tokens, models used to train the next model. The mechanism on the slides does not change; the budget line does. |
| V | Day to day | The chat box becomes an operator that drives your browser and desktop, not just a drafter. Ads in free consumer chat (ChatGPT since Feb 2026). The brief-it-like-a-person rules hold. |
| VI | Harnesses | Standard plugs win: MCP under the Linux Foundation’s Agentic AI Foundation; the harness decides the score (see ARC, slide 3). Harness choice matters more than model choice for most jobs. |
| VII | Your data | Evals stop being optional: one in five firms already say operating costs, tokens included, constrain their AI use (McKinsey, Aug 2026). The test set is the asset; expect to be asked to show yours. |
| VIII | Risk | Dates that land: EU AI Act new prohibitions and labelling for older generators, 2 Dec 2026; Annex III high-risk duties moved to 2 Dec 2027. More agent incidents; more insurance questions. |
| IX | Landscape | Prices move both ways: Gemini 4 Argon doubles to $4 / $20 on 1 Dec 2026 while open models keep undercutting. Anthropic’s S-1 is public; OpenAI filed confidentially and says not in 2026. |
| X | Beyond the chat box | Humanoids leave the pilot: Agility’s Digit at two more GXO sites from early 2027, Atlas to customers beyond Hyundai and DeepMind, Optimus in “early production”. Fenced floors; still no reliability figures. |
| XI | Building | Coding agents go from two firms in ten scaling them (McKinsey) to the default. The prototype is free; the product still costs what it did. More code, and much more code to review. |
| XII | The organisation | 39% of firms expect AI to cut headcount this year; only 14% saw a cut last year. Expect that gap to persist, and the EBIT question (37% report any impact, flat on 2025) to get sharper. |
Sources per row in the notes. Checked 28 October 2026. These change: re-check before you quote them. Next issue: February 2027.
Each row is where the evidence points, not a bet. The Part it names has the mechanism.
One line per Part, each the thing most likely to have changed by next autumn, and each labelled as an expectation rather than a prediction, because the difference is the whole point of this deck. Part II: open models of about thirty billion parameters, Meta’s Apache-licensed Muse Glimmer among them, already run on a good laptop and match where the frontier stood a year earlier; expect more of your jobs to pass the local test, and expect licences to keep changing. Part III: agent features will arrive inside software you already pay for, mostly unasked, and Gartner’s June 2025 forecast that more than 40 percent of agentic projects will be cancelled by the end of 2027 still stands; run the sniff test on each. Part IV: longer context, more hidden reasoning billed as output, and labs using models to build the next model; the mechanism does not change, the bill does. Part V: the chat box becomes an operator that drives a browser and desktop, and free consumer chat carries advertising, which ChatGPT has done for free and Go users since February 2026. Part VI: standard plugs, with MCP under the Linux Foundation’s Agentic AI Foundation since December 2025, and the ARC result on slide three as the proof that the harness, not just the model, sets the score. Part VII: McKinsey’s August 2026 survey found about one in five respondents saying AI operating costs, token costs included, constrain their use, which makes evals a budget tool. Part VIII: after the EU’s Digital Omnibus, two new prohibitions and labelling duties for generative systems already on the market apply from 2 December 2026, and Annex III high-risk obligations moved from August 2026 to 2 December 2027. Part IX: Google’s own price page doubles Gemini 4 Argon to four and twenty dollars per million tokens on 1 December 2026, open models keep undercutting, Anthropic’s S-1 is public, and OpenAI confirmed a confidential filing in June while Altman told Fortune in September it will not list in 2026. Part X: Agility’s Digit goes to two more GXO warehouses from early 2027 after 100,000 totes at the first, Boston Dynamics says Atlas reaches customers beyond Hyundai and DeepMind in early 2027, and Tesla began what Musk called “early production” of Optimus in Fremont on 21 October; still fenced floors, still no published reliability figures. Parts XI and XII, from the same McKinsey survey: about two in ten organisations scaling coding agents, 39 percent expecting AI to reduce headcount against 14 percent that saw it happen, and 37 percent reporting any EBIT impact, unchanged for a year.
Sources (13)
- https://en.wikipedia.org/wiki/Muse_Spark
- https://dev.meta.ai/resources/blog/build-with-muse-spark-open
- https://www.gartner.com/en/newsroom/press-releases/2025-06-25-gartner-predicts-over-40-percent-of-agentic-ai-projects-will-be-canceled-by-end-of-2027
- https://www.honeyb.ai/blog/chatgpt-ads-february-2026
- https://www.anthropic.com/news/donating-the-model-context-protocol-and-establishing-of-the-agentic-ai-foundation
- https://www.mckinsey.com/capabilities/quantumblack/our-insights/the-state-of-ai
- https://www.orrick.com/en/Insights/2026/07/EU-AI-Act-Update-Digital-Omnibus-Finalizes-8-Compliance-Changes
- https://www.actuia.com/en/news/googles-gemini-4-argon-api-to-double-prices-on-1-december/
- https://thenextweb.com/news/anthropic-ipo-filing-nasdaq-ant-s-1
- https://forgeglobal.com/insights/openai-upcoming-ipo-news/
- https://investors.gxo.com/news-releases/news-release-details/gxo-and-agility-robotics-expand-partnership-accelerate
- https://www.automate.org/robotics/industry-insights/boston-dynamics-to-begin-production-on-redesigned-atlas-humanoid-in-2026
- https://techcrunch.com/2026/10/21/tesla-stars-optimus-robot-production-in-california-as-profit-falls-43/
What will not change. Six questions, and the re-check.
What is the job?
Parts I, XII. Which inbox, which queue, which decision. Write it down first.
Who holds the weights?
Parts II, IX. A file you keep, or a key someone can revoke. Pin the version.
What is the agent allowed to touch?
Parts III, VI, VIII. Prompts are suggestions; permissions are walls.
Who is awake when it fails?
Parts III, VIII. A named human, a log, a way to stop it. “The vendor” is not an answer.
What does it cost per job?
Parts VII, IX. Tokens × price × retries, plus the human check.
Who owns the output?
Parts V, VIII, X. You do. Air Canada paid for its chatbot’s promise (2024).
The quarterly re-check.
Every slide stamped “Checked October 2026”. Part IX: the price board and the map. Part X: the bodies board and the tools board. Part III: the platform rules and build / buy. Part VIII: the regulation dates. Part II: the hardware and model names. Part I: the “who is on the field” slide.
Thirty minutes a quarter. Re-run the three-model eval, re-read the board, re-read the licence. Then update one slide, and this deck.
Next issue: February 2027.
Questions carried from the Part I and Part IX closers. Issue · November 2026. Next issue: February 2027.
The last slide is the one that does not get re-issued. Six questions have run through every part of the series, and they are the things to hold onto when the names on the other four slides have gone stale. What is the job: Parts I and XII both insist that the question is never “where can we use AI” but which inbox, which queue, which decision, written down well enough that a stranger could do it. Who holds the weights: Parts II and IX, a file you keep or a key someone else can revoke, with the licence read, the version pinned and a fallback that passes your eval. What is the agent allowed to touch: Parts III, VI and VIII, where prompts are suggestions and permissions are walls. Who is awake when it fails: a named human, a log and a kill switch, because “the vendor” has never once been the answer. What does it cost per job: Parts VII and IX, the only number that survives a price change. And who owns the output: you do, as Air Canada discovered in a British Columbia tribunal in February 2024, for every word, action and picture made under your name. The right-hand panel is the maintenance schedule. This deck is re-issued every quarter, and with it the slides in the main series that carry a check date: Part IX’s price board and map, Part X’s bodies board, Part III’s platform rules and build-or-buy slide, Part VIII’s regulation dates, Part II’s hardware and model names, Part I’s map of who is on the field. Thirty minutes a quarter: re-run the three-model eval, re-read the board, re-read the licence, update one slide. Then the closing line, which is the series’ own: the names will be wrong by February; the questions will not.